Schedule

My intermediate look like this:

2015
-Create plans and measured from Blue Zzero
-Me living in Amsterdam and navigate.
-Zero create a large blue tent, under which can be used almost in all weathers. Is also required to weld well.
-Refresh my aluminum MIG welding skills.
-All coarse seam renovations prepare and already starting to do.
-Remove existing insulation.

2016
-done the major welding and metal work.
-Electric motors fit
-Build generator
-All Windows install
-Start insulation
-Rigging (mast, tree, rigging, sails,…) create.
-1. great point: end starting at the 2016 2017 to sail Blue Zero for the first time, so that I see and experience, how good blue zero under sail is, or What changed/adjusted must be.

2017
-Implement changes from the test sailing.
-Get ready insulation
-Start interior design (electrical, heating, plumbing, floors, walls, furniture,…). Build deck covering.

2018/2019
-Continue to work in the interior design.
-Enlarge battery bank.
-Solar cells mounted.
-Many detail work stop.
– And between sail again by always go and try it out.

2019/2020
The first great sailing holidays in Northern Europe with Blue Zero enjoy and eliminate teething problems.

by 2020
Discover the world with Blue Zero.